Daewoo Office

Daewoo Office

18.28 billions dong18.28 billions dong

Investment cost for an HVAC system

 993.5 millions dong 993.5 millions dong

Annual Operating Cost

LEED Silver certification

LEED Silver certification

Daewoo Office

Daewoo Office

Investor: Daewoo E&C

Type:Office

Location:Lot K8-HH1, Tay Ho Tay Urban Area, Xuan La Ward, Tay Ho District, Hanoi, Vietnam

Total floor area:33,200 m²

Consulting package: LEED

Project properties: New Construction

Daewoo Office

Daewoo Office

Daewoo Office is an office project invested by Daewoo E&C – a leading South Korean construction and real-estate development group. Backed by extensive experience delivering large-scale, international-standard buildings, Daewoo Office is one of the group’s key new urban development projects.

Daewoo Office targets LEED BD+C Silver certification. The preliminary calculated energy saving is 36.2% against the ASHRAE baseline. In parallel, Edeec has advised the project on effectively capturing other key LEED credit categories, including reduced indoor water use, improved overall energy performance, and better indoor air quality in the workspace. Solutions for the MEP systems and operation strategies raised the building’s heat-recovery effectiveness. Edeec also recommended daylight measures so the building is designed to maximize natural daylight while minimizing glare. These solutions balance energy efficiency with visual comfort, improving the quality of the workspace and the occupant experience.

During the design review, Edeec researched and modeled potential technical solutions to optimize the project’s energy performance, achieving clear cost-and-operations milestones:

  • Design optimization delivers 45.88% energy savings against the LEED baseline (vs. 36.2% in the current design).
  • HVAC investment cost reduced by VND 18.28 billion versus the current design.
  • Operating costs cut by VND 993.5 million per year versus the current design.

Menu chính (En)