18.28 billions dong
Investment cost for an HVAC system
993.5 millions dong
Annual Operating Cost
LEED Silver certification
Investor: Daewoo E&C
Type:Office
Location:Lot K8-HH1, Tay Ho Tay Urban Area, Xuan La Ward, Tay Ho District, Hanoi, Vietnam
Total floor area:33,200 m²
Consulting package: LEED
Project properties: New Construction
Daewoo Office is an office project invested by Daewoo E&C – a leading South Korean construction and real-estate development group. Backed by extensive experience delivering large-scale, international-standard buildings, Daewoo Office is one of the group’s key new urban development projects.
Daewoo Office targets LEED BD+C Silver certification. The preliminary calculated energy saving is 36.2% against the ASHRAE baseline. In parallel, Edeec has advised the project on effectively capturing other key LEED credit categories, including reduced indoor water use, improved overall energy performance, and better indoor air quality in the workspace. Solutions for the MEP systems and operation strategies raised the building’s heat-recovery effectiveness. Edeec also recommended daylight measures so the building is designed to maximize natural daylight while minimizing glare. These solutions balance energy efficiency with visual comfort, improving the quality of the workspace and the occupant experience.
During the design review, Edeec researched and modeled potential technical solutions to optimize the project’s energy performance, achieving clear cost-and-operations milestones: