35%
HVAC system capacity
510 MILLION VND
Operating cost/year
Investor: CEO Group
Type:Hotel Resort Condotel
Location:Nha Trang
Total floor area:32,600 m²
Consulting package: Energy simulation design
Project properties: New building
The project simulated material selection, glazing, HVAC system capacity calculation, and energy analysis to help the building achieve optimal energy efficiency. Simulation shows that the air conditioning system can be reduced by up to 35% when optimized deeply. The project has the potential to save VND 510 million in annual operating costs.
Optimizing the HVAC system and reducing its investment allows the project to stay within budget and achieve energy efficiency, whilst ensuring thermal comfort in each space and cutting long-term operating costs.